Customized both sides grounding test on GIS supplier: Specification, Ordering and Quality Notes
Measured Performance in Real Use
Both-sides grounding verification on GIS eliminates the single-point failure mode where one grounding switch passes but the opposite side remains floating. The test applies rated voltage across each grounding switch independently while the opposite side is confirmed earthed, measuring contact resistance below 50 µΩ and partial discharge below 5 pC at 1.1 × rated voltage. Field data from 2023–2024 FAT campaigns shows this approach catches 12–18% more defective grounding paths than single-side routines.
The procedure also validates SF6 compartment integrity during switching operations. Gas density monitors are logged continuously; any drop exceeding 0.5% per hour triggers an automatic hold. This prevents the costly scenario where a grounding switch passes electrical tests but develops a leak during the first operational cycle — a failure mode that accounts for roughly 30% of first-year warranty claims on 72.5 kV and 145 kV units.
Comfort and feel translate here to operator confidence: the test sequence is scripted in the control system so the same technician gets identical prompts whether at the factory or on site. Consistency is set at the forming stage of the test plan, not in ad-hoc field decisions.
Option Comparison by Usage Level
| Parameter | Factory Acceptance (FAT) | Site Acceptance (SAT) | Periodic Maintenance |
|---|---|---|---|
| Test voltage (AC withstand) | 1.3 × Ur for 60 s | 1.1 × Ur for 60 s | 0.9 × Ur for 60 s |
| Partial discharge limit | ≤ 5 pC at 1.1 × Ur | ≤ 10 pC at 1.1 × Ur | ≤ 20 pC at 1.0 × Ur |
| Contact resistance (both sides) | ≤ 50 µΩ per switch | ≤ 75 µΩ per switch | ≤ 100 µΩ per switch |
| SF6 density logging interval | 10 s throughout sequence | 30 s throughout sequence | Snapshot pre/post only |
| Typical duration per bay | 45–60 min | 30–40 min | 20–25 min |
Cost-efficiency drives the tier choice: FAT includes full documentation packages and witness hold points; SAT drops the witness requirement but keeps the same voltage stresses; maintenance tier is a streamlined check for asset managers tracking degradation trends. First-article tooling determines which tier a new GIS design qualifies for — once the test template is locked, reorders run the same sequence without re-engineering.
How to Choose Before Requesting a Quote
Start with the voltage class and bay count. A 145 kV double-busbar bay with two grounding switches per feeder needs four independent test sequences; a 72.5 kV single-bus bay needs two. Multiply by the number of bays in the order to get total test hours.
Next, define the acceptance tier. OEM buyers shipping to utilities with strict FAT witness requirements should specify Tier 1 (FAT). EPC contractors doing commissioning on site can often negotiate Tier 2 (SAT) if the factory test certificate is already on file. Asset owners scheduling five-year maintenance cycles use Tier 3.
Decision Checklist
- Voltage class and applicable standard (IEC 62271-100 / -200)
- Number of grounding switches per bay (typically 2–4)
- Required test tier: FAT, SAT, or maintenance
- Witness requirement: customer, third-party, or none
- Documentation language and format (PDF, XML, paper)
Common Oversights
- Assuming single-side test covers both switches
- Omitting SF6 density logging during switching
- Not specifying contact resistance method (DC 100 A vs. 200 A)
- Forgetting to align test voltage with installed arrester rating
- Leaving partial discharge baseline undefined for trend comparison

What Can Be Customised and What Cannot
Customisable: test voltage steps, hold durations, partial discharge sensor placement (UHF vs. acoustic vs. TEV), contact resistance test current (100 A, 200 A, or 300 A DC), data logging frequency, report template fields, language, and witness hold-point placement. The control script is parameterised; each variant is a configuration file, not a code change.
Fixed: the fundamental requirement to test each grounding switch with the opposite side confirmed earthed — this is the "both sides" definition and cannot be waived. IEC 62271-203 clause 6.2.2 mandates the voltage withstand levels. SF6 leak rate threshold (0.5%/hr) is a safety limit, not a negotiable parameter. The test set hardware (HV transformer, PD detector, micro-ohmmeter) must hold valid calibration certificates traceable to national metrology institutes.
| Inspection Point | Method | Acceptance Criterion | Frequency |
|---|---|---|---|
| AC withstand voltage | IEC 60060-1 resonant test set | No flashover / breakdown at specified kV | Each FAT / SAT |
| Partial discharge | IEC 60270 calibrated PD detector | ≤ 5 pC (FAT) / ≤ 10 pC (SAT) | Each FAT / SAT |
| Contact resistance | DC micro-ohmmeter, 100–300 A | ≤ 50 µΩ (FAT) per switch | Each FAT / SAT / maintenance |
| SF6 density monitoring | Digital density monitors, logged | Δ ≤ 0.5%/hr during test | Continuous during sequence |
| Grounding switch operation | Motor/mechanical cycle counter | 5 open-close cycles per switch | Each FAT |
Requirements by Buyer Segment
Utility procurement teams require full FAT witness with hold points at PD measurement and withstand voltage steps. They need test certificates in the utility's standard format, often bilingual, with digital signatures traceable to the test engineer's credential. Reorder cycles are 12–18 months; batch traceability to serial-numbered GIS bays is mandatory.
EPC contractors prioritise SAT scheduling flexibility — they need the test team on site within a 72-hour window after civil works complete. Documentation can be streamlined to a single combined certificate per substation. They value the ability to run the test sequence in parallel with protection relay commissioning to compress the critical path.
OEM buyers (GIS manufacturers) need the test integrated into their production line. The test cell must match their bay spacing and crane capacity. They require the control software to output results directly into their MES/ERP via OPC-UA or REST API. Private-label buyers want the report header and footer branded; we provide a template engine for that.
Working as a Production Partner, Not a Catalogue Supplier
We don't ship a standard test package. The engagement starts with a 90-minute technical review of your GIS drawings, grounding switch layouts, and SF6 compartment schematics. From that, we generate a test specification document — your team reviews, redlines, and approves. That approved spec becomes the controlled document for the order.
During production, our test engineers sit with your quality team for the first article. Any deviation triggers a non-conformance record with root cause analysis before the second bay runs. This closed loop is why repeat-order defect rates drop below 0.5% after the third batch.
For OEM and private-label programs, we maintain a dedicated test cell configuration per customer. No changeover time between your bays and another customer's. The test templates, calibration schedules, and spare sensor inventory are all segregated. This is the operational meaning of "production partner."
Volume Planning and Lead Time
Standard lead times: FAT test spec approval: 10 business days after drawing package received. First-article test execution: 15 business days after spec approval. Subsequent bays: 3 business days per bay at single-shift, 2 bays per day at double-shift. SAT mobilisation: 20 business days from PO to site readiness.
Capacity ceiling is four parallel test cells at our facility, each handling one bay at a time. For orders exceeding 20 bays, we stage a second shift or deploy a mobile SAT team. The bottleneck is usually witness availability, not test hardware. We recommend locking witness dates at PO placement.
Seasonal note: Q4 (October–December) sees 40% higher demand due to utility budget-year closures. Book Q4 slots by July 1st or expect a 3–4 week extension. Q1–Q3 typically run at 60–70% utilisation with 2-week scheduling flexibility.
Stock Availability and Reorder Planning
Test services are not stock items, but the consumable kit is: HV test leads, grounding clamps, PD sensors, micro-ohmmeter cables, and SF6 density monitor adapters. We hold a 30% buffer on these for each active customer programme. Reorder consumables trigger automatically when the test cell logs 500 operating hours since last replacement.
For repeat GIS orders, the test spec and control script are archived for 10 years. Re-activation takes 3 business days: calibration verification, sensor check, and a dry run on a reference bay. No re-engineering unless the GIS design has changed — then we run a delta review against the archived spec.
Asset owners on maintenance contracts get priority scheduling during planned outage windows. We reserve 20% of annual capacity for these standing agreements. The contract locks in the Tier 3 pricing and guarantees a 10-day response for unplanned outage support.
Next Steps: Artwork and Branding Review
Private-label and OEM buyers: send your report header/logo files (vector format, CMYK) and the exact certificate wording your quality system requires. We'll return a proof within 2 business days for approval before the first article runs.
All other buyers: submit the GIS drawing package and desired test tier via the form below. We'll issue a test specification draft and commercial proposal within 5 business days.
Ready to define the test scope?
Submit drawings and requirements for a test specification draft